Mira Power Limited management had a courtesy meeting with Managing Director of National Transmission and Despatch Company (NTDC). Both parties discussed the matters of mutual interest. CEO briefed the Managing Director about the progress on the Project. The matter of interconnection and power evacuation was discussed in detail and NTDC assured their full cooperation to take up the matter on timely basis.