An amendment to the existing contract was agreed between Mira Power Limited and Hagler Bailly to incorporate the additional assignment. This additional assignment included climate change risk assessment required by project lenders. Hagler Bailly Pakistan will undertake this activity through a joint venture with Tetra Tech USA.